BESS Course
The BESS Course for
utility-scale battery storage.
Eight self-paced modules that take you from what a BESS is to how projects get financed, built, connected, and decommissioned — written for people who work on real projects.
- 8 modules
- ~7 hours
- Self-paced
- Completion certificate
By engineers who have delivered GWh of utility-scale BESS projects.
Is this the right BESS course for you?
The course is built around utility-scale projects — grid-connected plants in the tens to hundreds of MW. Here's who it fits.
A good fit if you are
- Moving into BESS from solar, wind, oil & gas, or power engineering and need the vocabulary and commercial logic fast
- New at a BESS company — developer, EPC, manufacturer, asset owner, or lender — and want the full project picture in days, not months
- Onboarding a team and need one shared baseline of terminology, standards, and frameworks
- Already in BESS and want structured coverage of the areas outside your own role
Probably not the right fit if you want
- Residential or home batteries — every module is about utility-scale plants
- A hands-on installer qualification — this is self-paced online training, not a site or electrical license
What the BESS course covers
The modules follow the order a project is built in. Take them in sequence or jump to the topic you need.
- 1
BESS 101 — What is a Battery Energy Storage System?
What is BESS and how does it work? A clear introduction to utility-scale battery energy storage — what it is, why it exists, how it generates revenue, and where the industry is heading.
Start free → - 2
BESS Technology Stack — DC Blocks, PCS, Transformers & Power Plant Controllers
The equipment and technology of a utility-scale BESS plant. DC blocks, PCS, AC blocks, MV infrastructure, HV substations, and the control stack explained.
- 3
BESS Value Chain — Who Does What in Energy Storage Projects
The key stakeholders in a utility-scale BESS project — developers, EPCs, manufacturers, asset owners, service providers, RTM providers, lenders, and insurers.
- 4
How BESS Makes Money — Revenue Streams & Market Mechanics
How utility-scale BESS generates revenue from FCR, FFR, aFRR, energy arbitrage, and capacity markets. Revenue stacking, market evolution, and net revenue factors.
- 5
BESS Project Lifecycle — Development, Construction & Commercial Operation
BESS project lifecycle — how utility-scale battery projects move from origination through financing, construction, commissioning, and commercial operation.
- 6
BESS Fire Safety & Grid Compliance — UL 9540A & Grid Codes
Fire safety and grid compliance for utility-scale BESS — thermal runaway, UL 9540A, NFPA 855, grid codes, fault ride-through, and plant classification.
- 7
BESS Project Bankability — Lenders, Tier Lists, Guarantees & Insurance
How lenders, manufacturers, EPCs, BNEF Tier lists, guarantees, and insurance together decide whether a BESS project gets built.
- 8
BESS End of Life & Recycling
How the EU Battery Regulation applies to utility-scale BESS — end-of-life triggers, producer responsibility, recycling targets, and the battery passport.
How the course works
Self-paced, online
Read on desktop, tablet, or phone. Finish in a week or spread it over a few months.
Illustrations that explain the system
Diagrams of the plant, the value chain, and the project lifecycle — not stock photos.
Built-in Q&A
Check your understanding at the end of each section before moving on.
Completion certificate
Finish the course and claim a certificate you can share with your employer.
Start free. Unlock the full course when you're ready.
Module 1 needs no account and no card. All-Access opens every module and every specialist guide.
Module 1
Free
No account needed
- BESS 101 — what a BESS is, why it exists, how it earns revenue
- The full BESS Glossary
- Free tools, including the BESS Readiness Assessment
All-Access
Full course
Monthly subscription or 12-Month Pass
- All 8 modules
- Every specialist guide
- All new content published during your access
- Completion certificate
Buying for a team? Invoice and PO billing with volume pricing — get team pricing.
BESS course FAQ
Is there a free BESS course?
Module 1 of the learnBESS course is free with no account needed. It covers what a battery energy storage system is, why it exists, how it generates revenue, and where the industry is heading. The BESS Glossary and the free tools are also open to everyone.
How long does the BESS course take?
About 7 hours of reading across 8 modules, from 15 to 70 minutes each. It's fully self-paced.
Do I need prior experience in energy storage?
No. Module 1 starts from the fundamentals. Later modules assume you've read the earlier ones, but experienced professionals can skip ahead.
Does the course cover the US or Europe?
Both. Fire safety is covered through UL 9540A and NFPA 855, and grid compliance through grid codes and fault ride-through. Revenue and end-of-life modules draw on European markets (FCR, aFRR) and the EU Battery Regulation.
Do I get a certificate?
Yes. All-Access includes a completion certificate once you've finished the course.
Can my company pay by invoice?
Yes. Every purchase comes with an expense-ready receipt, and teams can buy by invoice or purchase order with volume pricing — get in touch.
Start the BESS course today.
Module 1 is free. The full course is one click away when you need it.